jobs in AG Staffing Malaysia

Kerja Sepenuh Masa Environmental Engineers (Data Centre Construction) Johor Bahru (MNC), Gaji tinggi MYR 8,000 di AG Staffing Malaysia Johor - Maukerja

Environmental Engineers (Data Centre Construction) Johor Bahru (MNC)

MYR5,000 - MYR8,000 Sebulan
Kongsi
Simpan

Lokasi Kerja

  • Johor Bahru Johor Malaysia

Penerangan Kerja

Tanggungjawab

Environmental Engineers (Data Centre Construction) - Johor Bahru (MNC)

The environmental engineer in data centre construction manages site sustainability, regulatory and environmental compliance.

Key Responsibilities

  • Mitigate construction impacts, like dust and water use, and ensure sustainable, green-certified infrastructure from the ground up.
  • Environmental Compliance: Managing waste disposal (e.g., scheduled waste), controlling air quality, and securing necessary environmental permits before and during construction.
  • Resource Sustainability: Overseeing critical data center requirements like water stewardship (e.g., rainwater harvesting, cooling water efficiency) and power optimization.

Preferences

  • At least 5 years of relevant environmental management experience in construction projects.
  • Degree or diploma in Environmental Engineering, Environmental Management, Civil Engineering or related discipline.
  • Familiar with environmental compliance requirements, site environmental inspection, waste management, pollution control, erosion and sediment control, and environmental reporting.
  • Able to coordinate with client, consultant, subcontractors and relevant authorities when required.
  • Relevant local certification or project experience in Malaysia will be an added advantage.
  • Good communication skills

Job Types: Full-time, Permanent

Pay: RM5,000.00 - RM8,000.00 per month

Work Location: In person

Peringatan Penting

Jangan pernah kongsikan maklumat bank atau kad kredit anda semasa memohon pekerjaan. Elakkan membuat sebarang pembayaran atau mengisi survey yang tidak berkaitan. Jika ada yang mencurigakan, sila laporkan iklan pekerjaan ini segera.

Lebih Lanjut