- Johor Bahru Johor Malaysia
Working Location
Job Description
Responsibilities
.Job Description: Electrical Engineer
Position Purpose
The Electrical Engineer owns the power infrastructure of the data centre. This role manages everything from the high-voltage utility connection down to the server racks, ensuring continuous, redundant power distribution.
Key Responsibilities
· Power Infrastructure Build: Supervise the installation of HT/MV/LV switchgears, transformers, diesel generators, UPS systems, and Power Distribution Units (PDUs).
· Testing Oversight: Lead the site testing for electrical systems, including insulation testing, protection relay calibration, and load bank testing.
· Authority Liaison: Coordinate with local utility providers (like TNB) and regulatory bodies for testing, energization, and permanent power connection.
· Safety & Compliance: Ensure all electrical installations comply with local safety standards, electrical grid codes, and site health guidelines.
Job Types: Full-time, Contract
Pay: RM6,000.00 - RM12,000.00 per month
Work Location: In person
Important Information
Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.