jobs in AG STAFFING

Kerja Sepenuh Masa Substation EHS - HSE Manager (Data Centre Construction) PMC - JB, Gaji tinggi MYR 15,000 di AG STAFFING Johor - Maukerja

Substation EHS - HSE Manager (Data Centre Construction) PMC - JB

MYR10,000 - MYR15,000 Sebulan
Kongsi
Simpan

Lokasi Kerja

  • Johor Bahru Johor Malaysia

Penerangan Kerja

Tanggungjawab

Substation EHS / HSE Manager (Data Centre Construction) PMC - JB

A Substation Environment, Health, and Safety (EHS) Manager in Malaysia oversees high-voltage electrical safety, regulatory compliance with DOSH (Department of Occupational Safety and Health), and risk mitigation.

Key responsibilities involve managing Permit-to-Work (PTW) systems, leading safety audits for high-risk energization activities, and enforcing zero-incident targets.

Core Responsibilities

Regulatory Compliance: Ensure alignment with the Malaysian Occupational Safety and Health Act (OSHA) and coordinate closely with DOSH.

High-Voltage Safety Management: Oversee Safe Work Method Statements (SWMS), risk assessments (HIRARC), and safety protocols during high-voltage (HV) substation construction, testing, and commissioning.

Permit-to-Work (PTW): Control and audit high-risk work permits for daily site operations and contractor activities.

Incident Prevention: Lead safety inductions, toolbox talks, safety campaigns, and incident root-cause investigations.

Requirements & Qualifications

Certification: Valid registration as a Safety and Health Officer (SHO) with DOSH Malaysia along with specialized green/yellow book credentials or relevant safety certifications.

Experience: Background in managing EHS in high voltage substation projects for data centre, heavy industrial, electrical infrastructure, utility.

Job Types: Full-time, Contract

Pay: RM10,000.00 - RM15,000.00 per month

Work Location: In person

Peringatan Penting

Jangan pernah kongsikan maklumat bank atau kad kredit anda semasa memohon pekerjaan. Elakkan membuat sebarang pembayaran atau mengisi survey yang tidak berkaitan. Jika ada yang mencurigakan, sila laporkan iklan pekerjaan ini segera.

Lebih Lanjut