jobs in AG STAFFING

Full Time Substation Electrical Managers (Data Centre Construction) - PMC - JB Jobs, Salary up to MYR 18,000 in AG STAFFING Johor - Maukerja

Substation Electrical Managers (Data Centre Construction) - PMC - JB

MYR12,000 - MYR18,000 Per Month
Share
Save

Working Location

  • Johor Bahru Johor Malaysia

Job Description

Responsibilities

Substation Electrical Managers (Data Centre Construction) - PMC - JB

Key Responsibilities

A Substation Senior Electrical Manager for data centre construction leads the high-voltage power supply, grid connection, and on-site substation infrastructure. Key duties include managing high-voltage (HV/EHV) design, coordinating utility grid integration, and overseeing site installation and safety compliance.

Core Responsibilities

  • Grid Integration: Manage high-voltage and extra-high-voltage (HV/EHV) power connections with local utility providers.
  • Design & Engineering: Oversee layout and technical specifications for transformers, switchgears, and protection systems.
  • Project Delivery: Monitor project schedules, budgets, and contractor performance from construction to final testing.
  • Safety & Compliance: Ensure all electrical installations meet local grid codes and international mission-critical safety standards.

Preferences

  • Education: Bachelor’s degree in Electrical Engineering.
  • Technical Skills: Deep expertise in high-voltage substations, power distribution, and mission-critical backup systems.

Job Types: Full-time, Contract

Pay: RM12,000.00 - RM18,000.00 per month

Work Location: In person

Important Information

Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.

Learn More