To ensure installation inspection visits are conducted by a competent engineer (in accordance with PPE 1994, Regulation 66) for Low Voltage (LV) installations (≤600V or >100A) at least once every month.
To ensure protection relay calibration is carried out at least once every two (2) years in accordance with PPE 1994, Regulation 110(4).
To carry out installation inspection and testing (including wiring) at least once every five (5) years in accordance with PPE 1994, Regulation 110(3) and the current requirements of the Energy Commission (ST).
...
Coordinate and lead the maintenance team on all machine / facilities breakdowns and maintenance inspections involving critical machine parameters and critical spare parts management.
Development and maintenance of maintenance documents as per ISO standards. i.e; SOP, WI, Maintenance schedule, etc.
...
Coordinate and lead the maintenance team on all machine / facilities breakdowns and maintenance inspections involving critical machine parameters and critical spare parts management.
Development and maintenance of maintenance documents as per ISO standards. i.e; SOP, WI, Maintenance schedule, etc.
...
Coordinate and lead the maintenance team on all machine / facilities breakdowns and maintenance inspections involving critical machine parameters and critical spare parts management.
Development and maintenance of maintenance documents as per ISO standards. i.e; SOP, WI, Maintenance schedule, etc.
...
Responsible for the operation, maintenance and troubleshooting of high-voltage electrical installations up to 33kV within the facility management site.
Ensure that all electrical systems operate efficiently, safely and in compliance with the Energy Commission (Suruhanjaya Tenaga) regulations and statutory requirements.
Oversee preventive and corrective maintenance, manage energy usage and coordinate with internal departments and contractors to minimize downtime.
...