Testing & System Verification: Lead physical inspections, loop checks, and testing sequences for MV/LV Switchgear, Power Transformers, UPS Systems, Static Transfer Switches (STS), and High-Capacity Diesel Generators.
Integrated Systems Testing (IST): Plan, script, and execute comprehensive site load-bank testing, blackouts, and complex failure-mode simulations.
Documentation & Procedures: Review, execute, and sign off on Commissioning Scripts, Method Statements, and Method of Procedures (MOPs).
...