Support inspection and maintenance program for static equipment (Pressure Vessel, piping and tanks for both topside and marine), as per local regulation, Code and Std & CLASS requirement for all BUMIARMADA fleets
MES Implementation (Project Phase): Represent Test and Plating equipment engineering in the MES rollout. Define workflows, recipe controls, and equipment states.
MES Implementation (Project Phase): Represent Die Prep equipment engineering in the MES rollout. Define workflows, setup/recipe controls, and equipment states.
The Senior Engineer's purpose is to design and engineer solutions that achieve high standards of safety, reliability, and sustainability, thereby contributing to the projects and organization's strategic objectives and long-term success.
MES Implementation (Project Phase): Represent equipment engineering in the MES rollout. Define equipment-specific workflows, setup/recipe controls, qualification requirements, and equipment states.
MES Implementation (Project Phase): Represent equipment engineering in the MES rollout. Define equipment-specific workflows, setup/recipe controls, qualification requirements, and equipment states.
Equipment Governance: Govern and execute Surface Treatment and Metrology equipment from conceptualization and piloting through to implementation, monitoring, and sustaining.
Provide onsite and remote support during Fluid Catalytic Cracking (FCC) / Fluid Coking (FLK) / Flexi Coking (FXK) unit shutdowns including equipment entry and assessment.
Provide onsite and remote support during Fluid Catalytic Cracking (FCC) / Fluid Coking (FLK) / Flexi Coking (FXK) unit shutdowns including equipment entry and assessment.
MES Implementation (Project Phase): Represent Test and Plating equipment engineering in the MES rollout. Define workflows, recipe controls, and equipment states.
MES Implementation (Project Phase): Represent Test and Plating equipment engineering in the MES rollout. Define workflows, recipe controls, and equipment states.
Open Health Chapter Sdn Bhd (OHC) is looking for an experienced Medical Device Sales Executive to develop our growing portfolio of diagnostic, laboratory and analytical equipment in Malaysia.
MES Implementation (Project Phase): Represent equipment engineering in the MES rollout. Define equipment-specific workflows, setup/recipe controls, qualification requirements, and equipment states.
MES Implementation (Project Phase): Represent equipment engineering in the MES rollout. Define equipment-specific workflows, setup/recipe controls, qualification requirements, and equipment states.
MES Implementation (Project Phase): Represent EOL Equipment Engineering in the MES rollout. Define equipment workflows, setup/recipe controls, qualification requirements, equipment states, and interlocks for both Mold and STF machines.
MES Implementation (Project Phase): Represent EOL Equipment Engineering in the MES rollout. Define equipment workflows, setup/recipe controls, qualification requirements, equipment states, and interlocks for both Mold and STF machines.