Commissioning Master Plan: Develop and execute comprehensive Commissioning Plans, scripts, and schedules in compliance with ASHRAE Guideline 0 and Uptime Institute standards.
Phase Execution (L1–L5): Direct Factory Witness Testing (L1), Component Static Verification (L2), Pre-functional / Equipment Startup (L3), Functional Performance Testing (L4), and Integrated Systems Testing / IST (L5).
Load Bank & Black Building Testing: Direct full-load heat dissipation tests with resistive/reactive load banks; lead Black Start, failure simulation, and emergency utility-to-generator auto-transfer scenarios.
...
Responsible to carry out inspection and repairs of the entire facility’s electrical installation and monitoring on high and low voltage facilities equipment performance.
Responsible to assist operation of the generator sets, synchronizing of generator sets, energizing electrical switch gear, panel boards and all electrical installation as required by operations.
Ensure equipment operations related to electrical and instruments are always maintained at optimum performance with minimum downtime. Responsible to assist operations team to troubleshoot electrical / instrument related and any emergency situations during operation.
...
Coordinate and supervise daily project activities at site to ensure works are completed according to project schedule, drawings, specifications, and client requirements.
Coordinate with Project Engineers, Site Supervisors, subcontractors, suppliers, and other project personnel to ensure smooth project execution.
Monitor site progress, manpower, materials, and equipment and report any delays or issues to the Project Manager.
...