Responsibility Jobs in Seberang Jaya - September 2026 - Urgent Hiring

Showing 7 jobs results for "responsibility" in Seberang Jaya
Never miss any updates for Responsibility jobs in Seberang Jaya
MYR3,000 - MYR4,000 Per Month
  • Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
  • Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.
  • Establishing System Bill of Materials (B.O.M) ...
Posted
21 days ago
Undisclosed
  • Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
  • Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.
  • Establishing System Bill of Materials (B.O.M) ...
Posted
2 months ago
Undisclosed
  • Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
  • Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.
  • Establishing System Bill of Materials (B.O.M) ...
Posted
2 months ago
Undisclosed
  • Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
  • Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.
  • Establishing System Bill of Materials (B.O.M) ...
Posted
2 months ago
Undisclosed
  • Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
  • Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.
  • Establishing System Bill of Materials (B.O.M) ...
Posted
2 months ago
Undisclosed
  • Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
  • Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.
  • Establishing System Bill of Materials (B.O.M) ...
Posted
2 months ago
Undisclosed
  • Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
  • Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.
  • Establishing System Bill of Materials (B.O.M) ...
Posted
2 months ago

Browse "responsibility" Job By: