jobs in AG STAFFING

Full Time MEP Design - BIM Coordination Engineers-Managers - Data Centre Construction - JB-KL Jobs, Salary up to MYR 18,000 in AG STAFFING Johor - Maukerja

MEP Design - BIM Coordination Engineers-Managers - Data Centre Construction - JB-KL

Share
Save

Working Location

  • Johor Bahru Johor Malaysia

Job Description

Responsibilities

Client is an international PMC hiring for multiple vacancies for their data centre contruction projects in JB, Nusajaya, KL and Cyberjaya.

MEP Design & BIM Coordination Engineers/Managers - Data Centre Construction - JB/KL

An MEP Design Manager in data centre construction leads the design, engineering, and coordination of critical mechanical, electrical, and plumbing systems from concept to commissioning. They ensure technical accuracy, budget adherence, and compliance with high-uptime standards, acting as the technical authority for complex infrastructure.

Key Responsibilities and Skills:

  • Design Oversight: Directs all MEP design phases, including detailed design and shop drawings.
  • Technical Expertise: Provides expertise in critical facility infrastructure (power, cooling, fire protection).
  • Coordination: Ensures seamless integration of MEP systems with structural and architectural elements.
  • Project Management: Manages design schedules, budgets, risk, and value engineering.
  • Collaboration: Liaises with clients, consultants, and contractors to ensure design intent aligns with construction.
  • Quality & Safety: Ensures installations meet strict quality standards and safety regulations

Preferences:

  • Experience: Requires 8–10+ years in MEP project delivery, specializing in mission-critical data centers.
  • Education: Bachelor’s degree in Electrical or Mechanical Engineering.

Job Types: Full-time, Contract

Pay: RM12,000.00 - RM18,000.00 per month

Work Location: In person

Important Information

Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.

Learn More