jobs in AG STAFFING

Full Time ELV - BMS - ICT Engineers (Data Centre Construction) JB Jobs, Salary up to MYR 12,000 in AG STAFFING Johor - Maukerja

ELV - BMS - ICT Engineers (Data Centre Construction) JB

Share
Save

Working Location

  • Johor Bahru Johor Malaysia

Job Description

Responsibilities

Job Description: ELV / BMS / ICT Engineers

Position Purpose

The ELV/BMS/ICT Engineer builds the control systems, security features, and network backbone of the facility. This role ensures the data centre can be monitored and operated safely in real-time.

Key Responsibilities

· BMS & Controls: Supervise the installation of Building Management Systems (BMS), SCADA, and Environmental Monitoring Systems (EMS) to track temperatures and power usage.

· Network Infrastructure: Manage the installation of structured cabling, including pathways, containment, and termination of high-strand fibre optic and copper cables.

· Security Systems: Oversee physical security infrastructure, including biometric access control, turnstiles, and CCTV cameras.

· Integration Testing: Test the software communication links (Modbus, BACnet, SNMP) between MEP hardware and the central control room.

Job Types: Full-time, Contract

Pay: RM6,000.00 - RM12,000.00 per month

Work Location: In person

Important Information

Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.

Learn More