jobs in STELLAR INTEGRATED SOLUTIONS SDN BHD

Full Time Engineer-Manager – ELV Systems (Data Center Construction) Jobs, in STELLAR INTEGRATED SOLUTIONS SDN BHD Johor - Maukerja

Engineer-Manager – ELV Systems (Data Center Construction)

STELLAR INTEGRATED SOLUTIONS SDN BHD

Share
Save

Working Location

  • Johor Bahru, Johor Johor Bahru Johor Malaysia

Job Description

Responsibilities

Engineer/Manager – ELV Systems (Data Center Construction)
Position Title

Engineer/Manager – ELV Systems (Data Center Projects)

Reporting To

Head of Projects / Project Director

Location

Johor Bahru (Project Site Based)

Position Overview

The Engineer/Manager – ELV Systems is responsible for the end-to-end management, coordination, execution, and successful delivery of Extra Low Voltage (ELV) and Integrated Security Systems for mission-critical Data Center construction projects.

The role oversees design coordination, procurement, installation, testing & commissioning, subcontractor management, and project delivery while ensuring compliance with project specifications, construction schedules, quality standards, cybersecurity requirements, and safety regulations.

The Engineer/Manager will work closely with clients, consultants, main contractors, system vendors, and internal engineering teams to deliver resilient, scalable, and fully integrated ELV solutions within budget and schedule.

Key Responsibilities

1. Project Planning & Execution

  • Lead and manage ELV systems implementation throughout the project lifecycle.

  • Develop and maintain project execution plans, schedules, manpower deployment, and milestones.

  • Ensure project delivery meets contractual requirements, timelines, and budgets.

  • Coordinate project activities with construction, M&E, ICT, and other trade contractors.

  • Monitor project progress and proactively mitigate risks affecting schedule or cost.

2. ELV Systems Management

Manage the deployment and integration of ELV and mission-critical systems including:

Security & Surveillance Systems

  • CCTV / Video Surveillance Systems (VMS)

  • Video Analytics & AI Analytics

  • Access Control Systems (ACS)

  • Perimeter Intrusion Detection Systems (PIDS)

  • Intercom & Emergency Communication Systems

  • Security Command Centre Integration

Infrastructure & Building Systems
  • Structured Cabling Systems

  • IP Network Infrastructure

  • Fiber Optic Backbone

  • Public Address / Voice Alarm Systems

  • Building Management System (BMS) Interfaces

3. Design & Technical Coordination
  • Review and coordinate ELV shop drawings, system architecture, schematics, and technical submissions.

  • Ensure designs comply with project specifications, local regulations, and international standards.

  • Coordinate with consultants and client teams for technical approvals and design clarifications.

  • Manage engineering changes, RFIs, and design revisions.

  • Validate system interoperability and integration requirements.

4. Procurement & Vendor Management
  • Manage procurement of ELV equipment and long-lead items.

  • Evaluate vendors and subcontractors for technical and commercial suitability.

  • Monitor delivery schedules and supply chain risks.

  • Coordinate Factory Acceptance Tests (FAT) and vendor inspections where required.

5. Site Construction Management
  • Supervise site installation activities and subcontractor performance.

  • Conduct site coordination meetings and progress reviews.

  • Ensure proper installation methods and compliance with approved drawings.

  • Resolve construction and interface issues promptly.

  • Monitor manpower productivity and installation quality.

6. Testing & Commissioning (T&C)
  • Lead system testing, integration, and commissioning activities.

  • Coordinate with client, consultant, and authority representatives during T&C.

  • Review and approve testing procedures and commissioning documentation.

  • Ensure all systems achieve performance and operational acceptance requirements.

  • Manage Integrated Systems Testing (IST) and handover activities.

7. Quality, Compliance & Cybersecurity
  • Ensure compliance with:

    • Project technical specifications

    • Data center operational requirements

    • International and local standards

    • QA/QC procedures

    • Cybersecurity and network segregation requirements

    • Client security and governance standards

  • Ensure all documentation and installations comply with approved methodologies and project standards.

8. Commercial & Contract Management
  • Monitor project budgets and cost performance.

  • Manage variation orders, claims, and change management processes.

  • Review subcontractor progress claims and invoices.

  • Track project financial performance and forecast cost risks.

  • Support contract administration and commercial negotiations where required.

9. Documentation & Reporting
  • Prepare and maintain:

    • Weekly and monthly project reports

    • Progress updates

    • Risk and issue registers

    • Technical documentation

    • Method statements

    • As-built drawings

    • O&M manuals

    • Handover documentation

  • Present project updates to management and clients.

Qualifications & Experience
Education
  • Degree or Diploma in:

    • Electrical Engineering

    • Electronics Engineering

    • Telecommunications

    • Building Services Engineering

    • Or related discipline

Experience
  • Minimum 3–8 years of experience in ELV or Integrated Security Systems projects.

  • Minimum 3–5 years managing large-scale Data Center or mission-critical infrastructure projects.

  • Proven experience managing multi-disciplinary construction teams and subcontractors.

  • Experience in hyperscale, colocation, or critical infrastructure environments preferred.

Technical Knowledge

Strong working knowledge of:

  • Data Center ELV and security architecture

  • IP networking and structured cabling

  • CCTV and Video Management Systems

  • Access Control Systems

  • Integrated Security Management Systems

  • Fiber optic infrastructure

  • Redundant and resilient network design

  • Cybersecurity principles for OT/ELV systems

  • Testing and commissioning procedures

  • Construction coordination and project controls

Key Competencies
  • Leadership and team management

  • Strong stakeholder management

  • Problem solving and decision making

  • Project planning and organization

  • Contract and commercial awareness

  • Technical troubleshooting

  • Communication and presentation skills

  • Risk management

  • Ability to work under demanding construction schedules

Preferred Certifications
  • WSQ / Workplace Safety certifications

  • Data Center or mission-critical project experience

  • Vendor certifications (advantageous)

  • CIDB

Employment Type

Full-Time

Industry

Data Centers / Mission-Critical Infrastructure / Integrated Security / ELV Systems / Construction

Important Information

Never provide your bank or credit card details when applying for jobs. Do not transfer any money or complete unrelated online surveys. If you see something suspicious, Report this Job ad.

Learn More