Responsible for inspecting and monitoring station building construction, competent about site construction and keeping an eye on key components and procedure
Responsible for checking and verifying all plans, coordinating design and planning works & construction drawings with all relevant parties
Oversee all technical aspects, engineering and construction activities according to project planning
...
Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.
Lead & manage the project team to complete assigned project(s) in a timely and cost-effective manner and in line with the safety and high standard quality
To coordinate and liaise with clients, architects, consultants, contractors and sub-contractors and attend site meeting
Preparing & submitting tender document and proposal
...
Project Management
Construction Management
Budget Management
Risk Management
Team Leadership
Contract Negotiation
Quality Control
Safety Management
Construction Planning
+7
Posted
a month ago
Chat Available
You can chat with the employer only after applying for this job.
Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.
Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.
Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.
Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.
Assessing project feasibility through product drawing and B.O.M review. (including built cycle time, avaibility of tools & equipment, non-recurring engineering (NRE) cost etc.)
Set up the bill of materials (B.O.M) for the request for quotation (RFQ) stage in the Agile system.