Responsible for the supervision, coordination, and technical support of extra-low voltage (ELV) systems in data centre projects, including access control, CCTV, fire alarm, PA, BMS, and structured cabling systems.
Prepare material take-offs, cost estimates, and ensure timely, high-quality project delivery.
Supervise and manage site installation teams to ensure compliance with safety and technical standards.
...
Responsible for the supervision, coordination, and technical support of extra-low voltage (ELV) systems in data centre projects, including access control, CCTV, fire alarm, PA, BMS, and structured cabling systems.
Prepare material take-offs, cost estimates, and ensure timely, high-quality project delivery.
Supervise and manage site installation teams to ensure compliance with safety and technical standards.
...
Responsible for planning, supervising, and coordinating all lifting operations on site to ensure compliance with safety standards and company procedures.
Develop and implement safe lifting plans and procedures in accordance with relevant regulations and standards (e.g., DOSH, CIDB).
Inspect and verify the condition and suitability of lifting equipment, slings, wire ropes, and shackles.
...
Inspect newly arrived electrical tools and equipment for each work team at the project site and prepare inspection reports.
Conduct daily maintenance, inspection, and safety checks on electrical systems and equipment such as distribution boards, lighting systems, and generators to ensure safety compliance.
Be familiar with certificates, reports, and documentation required for inspection and approval of electrical equipment.
...
Commissioning Master Plan: Develop and execute comprehensive Commissioning Plans, scripts, and schedules in compliance with ASHRAE Guideline 0 and Uptime Institute standards.
Phase Execution (L1–L5): Direct Factory Witness Testing (L1), Component Static Verification (L2), Pre-functional / Equipment Startup (L3), Functional Performance Testing (L4), and Integrated Systems Testing / IST (L5).
Load Bank & Black Building Testing: Direct full-load heat dissipation tests with resistive/reactive load banks; lead Black Start, failure simulation, and emergency utility-to-generator auto-transfer scenarios.
...
Commissioning Master Plan: Develop and execute comprehensive Commissioning Plans, scripts, and schedules in compliance with ASHRAE Guideline 0 and Uptime Institute standards.
Phase Execution (L1–L5): Direct Factory Witness Testing (L1), Component Static Verification (L2), Pre-functional / Equipment Startup (L3), Functional Performance Testing (L4), and Integrated Systems Testing / IST (L5).
Load Bank & Black Building Testing: Direct full-load heat dissipation tests with resistive/reactive load banks; lead Black Start, failure simulation, and emergency utility-to-generator auto-transfer scenarios.
...
Generate and coordinate Combined Services Drawings (CSD), Structural Electrical Mechanical (SEM) drawings, and Builder's Work Drawings (CBWD) in BIM (Revit/Navisworks).
Resolve spatial clashes among high-amp busbars, large-bore CHW risers, smoke exhaust ducting, and cable ladders to ensure optimal maintenance clearances.
3+ years experience resolving MEP spatial clashes on mission-critical facilities; advanced proficiency in Revit, Navisworks Manage, and AutoCAD.
...
Generate and coordinate Combined Services Drawings (CSD), Structural Electrical Mechanical (SEM) drawings, and Builder's Work Drawings (CBWD) in BIM (Revit/Navisworks).
Resolve spatial clashes among high-amp busbars, large-bore CHW risers, smoke exhaust ducting, and cable ladders to ensure optimal maintenance clearances.
3+ years experience resolving MEP spatial clashes on mission-critical facilities; advanced proficiency in Revit, Navisworks Manage, and AutoCAD.
...
Construction Management: Oversee mechanical pipe installation, welding quality (ASME/BS standards), pressure testing, system flushing, chemical passivation, and thermal insulation.
PUE & Efficiency Control: Ensure chiller plant optimization and thermal containment setup strictly align with project design PUE objectives and ASHRAE TC 9.9 thermal envelopes.
...
Construction Management: Oversee mechanical pipe installation, welding quality (ASME/BS standards), pressure testing, system flushing, chemical passivation, and thermal insulation.
PUE & Efficiency Control: Ensure chiller plant optimization and thermal containment setup strictly align with project design PUE objectives and ASHRAE TC 9.9 thermal envelopes.
...
Manage site installation, termination, testing, and system integration for BMS (Building Management System), EPMS (Electrical Power Monitoring System), DCIM, CCTV, Access Control, and Structured Cabling Systems.
Validate field DDC/PLC panel wiring, I/O point-to-point testing, and sensor calibration (temperature, differential pressure, humidity).
Configure and troubleshoot multi-protocol networking topologies including Modbus RTU/TCP, BACnet/IP, and SNMP over fiber/copper infrastructure.
...
Manage site installation, termination, testing, and system integration for BMS (Building Management System), EPMS (Electrical Power Monitoring System), DCIM, CCTV, Access Control, and Structured Cabling Systems.
Validate field DDC/PLC panel wiring, I/O point-to-point testing, and sensor calibration (temperature, differential pressure, humidity).
Configure and troubleshoot multi-protocol networking topologies including Modbus RTU/TCP, BACnet/IP, and SNMP over fiber/copper infrastructure.
...
Supervise installation and testing of Fire Alarm Systems (FAS), Very Early Smoke Detection Apparatus (VESDA), Pre-action Sprinklers, and Clean Agent Total Flooding Systems (IG541 / FM200 / Novec 1230).
Lead Room Integrity Fan Tests (Door Fan Test) and fire-interlock trip testing (HVAC shutdown, motorized damper closure, access door release).
Lead compliance tracking and liaison with local statutory fire authorities (e.g., Bomba / Local Authorities) for successful inspection clearance.
...
Supervise installation and testing of Fire Alarm Systems (FAS), Very Early Smoke Detection Apparatus (VESDA), Pre-action Sprinklers, and Clean Agent Total Flooding Systems (IG541 / FM200 / Novec 1230).
Lead Room Integrity Fan Tests (Door Fan Test) and fire-interlock trip testing (HVAC shutdown, motorized damper closure, access door release).
Lead compliance tracking and liaison with local statutory fire authorities (e.g., Bomba / Local Authorities) for successful inspection clearance.
...
Draft and implement the project Inspection and Test Plan (ITP); conduct Receiving Inspections (MIR), Non-Destructive Testing (NDT) witness, and hydrostatic pressure leak tests.
Supervise Clean Space Construction Protocols (White Space decontamination prior to IT equipment delivery) and lead Non-Conformance Report (NCR) tracking to resolution.
4+ years QA/QC experience in mission-critical MEP general contracting; ISO 9001 certified internal auditor preferred.
...
Draft and implement the project Inspection and Test Plan (ITP); conduct Receiving Inspections (MIR), Non-Destructive Testing (NDT) witness, and hydrostatic pressure leak tests.
Supervise Clean Space Construction Protocols (White Space decontamination prior to IT equipment delivery) and lead Non-Conformance Report (NCR) tracking to resolution.
4+ years QA/QC experience in mission-critical MEP general contracting; ISO 9001 certified internal auditor preferred.
...