jobs in AG STAFFING

Kerja Sepenuh Masa MEP Engineers (Data Centre Construction) JB, Gaji tinggi MYR 12,000 di AG STAFFING Johor - Maukerja

MEP Engineers (Data Centre Construction) JB

Gerbang Nusajaya, Johor

Kongsi
Simpan

Lokasi Kerja

  • Gerbang Nusajaya Johor Malaysia

Penerangan Kerja

Tanggungjawab

Job Description: MEP Engineer

Position Purpose

The MEP Engineer coordinates the installation, testing, and balancing of all Mechanical, Electrical, and Plumbing systems. This role bridges the gap between different engineering disciplines, ensuring that power, cooling, and water infrastructure integrate perfectly into the building design.

Key Responsibilities

· Site Coordination: Oversee and coordinate day-to-day installation activities for all MEP trades on the construction floor.

· Progress Tracking: Monitor subcontractor performance against the master construction schedule to prevent delays.

· Design Review: Cross-check structural, architectural, and MEP drawings to identify and resolve spatial clashes before installation using digital models.

· Testing & Commissioning (T&C): Assist the commissioning agent during the critical Level 1 to Level 5 data centre commissioning phases.

· Problem Solving: Resolve technical engineering issues and coordinate requests for information (RFIs) between site teams, clients, and consultants.

Job Types: Full-time, Contract

Pay: RM6,000.00 - RM12,000.00 per month

Work Location: In person

Peringatan Penting

Jangan pernah kongsikan maklumat bank atau kad kredit anda semasa memohon pekerjaan. Elakkan membuat sebarang pembayaran atau mengisi survey yang tidak berkaitan. Jika ada yang mencurigakan, sila laporkan iklan pekerjaan ini segera.

Lebih Lanjut