jobs in AG STAFFING

Kerja Sepenuh Masa Substation Electrical Managers (Data Centre Construction) - PMC - JB, Gaji tinggi MYR 18,000 di AG STAFFING Johor - Maukerja

Substation Electrical Managers (Data Centre Construction) - PMC - JB

MYR12,000 - MYR18,000 Sebulan
Kongsi
Simpan

Lokasi Kerja

  • Johor Bahru Johor Malaysia

Penerangan Kerja

Tanggungjawab

Substation Electrical Managers (Data Centre Construction) - PMC - JB

Key Responsibilities

A Substation Senior Electrical Manager for data centre construction leads the high-voltage power supply, grid connection, and on-site substation infrastructure. Key duties include managing high-voltage (HV/EHV) design, coordinating utility grid integration, and overseeing site installation and safety compliance.

Core Responsibilities

  • Grid Integration: Manage high-voltage and extra-high-voltage (HV/EHV) power connections with local utility providers.
  • Design & Engineering: Oversee layout and technical specifications for transformers, switchgears, and protection systems.
  • Project Delivery: Monitor project schedules, budgets, and contractor performance from construction to final testing.
  • Safety & Compliance: Ensure all electrical installations meet local grid codes and international mission-critical safety standards.

Preferences

  • Education: Bachelor’s degree in Electrical Engineering.
  • Technical Skills: Deep expertise in high-voltage substations, power distribution, and mission-critical backup systems.

Job Types: Full-time, Contract

Pay: RM12,000.00 - RM18,000.00 per month

Work Location: In person

Peringatan Penting

Jangan pernah kongsikan maklumat bank atau kad kredit anda semasa memohon pekerjaan. Elakkan membuat sebarang pembayaran atau mengisi survey yang tidak berkaitan. Jika ada yang mencurigakan, sila laporkan iklan pekerjaan ini segera.

Lebih Lanjut