- Johor Bahru Johor Malaysia
Lokasi Kerja
Penerangan Kerja
Tanggungjawab
Job Description: HVAC / Mechanical Engineer
Position Purpose
The HVAC / Mechanical Engineer is responsible for the massive cooling systems needed to keep servers from overheating. This role handles large-scale chilled water infrastructure and precision airflow systems.
Key Responsibilities
· Cooling Plant Installation: Supervise the installation of industrial chillers, cooling towers, CRAH/CRAC units, chilled water pipe networks, and pumps.
· Airflow Management: Ensure raised flooring, hot/cold aisle containment, and ductworks are tightly sealed and installed to specification.
· Pressure & Leak Testing: Oversee hydrostatic testing for chilled water piping and duct leakage testing protocols.
· System Balancing: Manage the Testing, Adjusting, and Balancing (TAB) of air and water systems to achieve optimal energy efficiency.
Job Types: Full-time, Contract
Pay: RM6,000.00 - RM12,000.00 per month
Work Location: In person
Peringatan Penting
Jangan pernah kongsikan maklumat bank atau kad kredit anda semasa memohon pekerjaan. Elakkan membuat sebarang pembayaran atau mengisi survey yang tidak berkaitan. Jika ada yang mencurigakan, sila laporkan iklan pekerjaan ini segera.