jobs in AG STAFFING

Kerja Sepenuh Masa Mechanical Project Managers - Data Centre Construction - PMC - Johor Bahru, Gaji tinggi MYR 18,000 di AG STAFFING Johor - Maukerja

Mechanical Project Managers - Data Centre Construction - PMC - Johor Bahru

MYR12,000 - MYR18,000 Sebulan
Kongsi
Simpan

Lokasi Kerja

  • Johor Bahru Johor Malaysia

Penerangan Kerja

Tanggungjawab

Mechanical Project Managers - Data Centre Construction - PMC - Johor Bahru

Key Responsibilities

1. Cooling Infrastructure & Technical Execution

  • System Delivery: Oversee the installation of large-scale chilled water systems, including high-efficiency centrifugal chillers, cooling towers, Computer Room Air Handlers (CRAHs), and Computer Room Air Conditioning (CRAC) units.
  • Liquid Cooling Transition: Drive the deployment of advanced cooling topologies for high-density AI clusters, including Direct-to-Chip (Liquid-to-Air / Liquid-to-Water) cooling, rear-door heat exchangers, and Coolant Distribution Units (CDUs).
  • Piping & Containment: Manage the fabrication and installation of heavy-duty condenser and chilled water piping networks, valve matrices, and secondary containment loops.

2. Life Safety, Fire & Ventilation Systems

  • BOMBA Integration: Lead the deployment of mission-critical gas suppression systems (e.g., Inergen, FM200, Novec 1230) and Pre-Action dry-pipe sprinkler systems, ensuring strict alignment with BOMBA requirements.
  • Ventilation & Smoke Extraction: Supervise the installation of pressurization fans, smoke spill systems, and fuel oil supply/storage networks for backup diesel generators.

3. Procurement, Planning & Coordination

  • Long-Lead Management: Track factory production, shipping logistics, and site delivery schedules for long-lead equipment (e.g., chillers, CRAHs, CDUs) to prevent critical path delays.
  • BIM & Space Coordination: Utilize Building Information Modeling (BIM) to resolve complex spatial clashes between heavy piping, ductwork, electrical busducts, and cable trays before site installation.
  • Subcontractor Management: Manage mechanical subcontractors, assess monthly progress claims, and evaluate variation orders (VOs).

Job Types: Full-time, Contract

Pay: RM12,000.00 - RM18,000.00 per month

Work Location: In person

Peringatan Penting

Jangan pernah kongsikan maklumat bank atau kad kredit anda semasa memohon pekerjaan. Elakkan membuat sebarang pembayaran atau mengisi survey yang tidak berkaitan. Jika ada yang mencurigakan, sila laporkan iklan pekerjaan ini segera.

Lebih Lanjut