To carry-out pre and post inspection, which include inspection on mould after mould change and mould condition prior to use, reinforcement arrangement, accessories and cast-in item, dimensional and appearance condition based on issued drawing.
Prepare the tooling to run the production according to schedule given.To collect and get ready the resin and material during the winding process for fitting production