Lead multi-disciplinary product launch teams through Phase-Gate / NPI frameworks (Proto, EVT, DVT, PVT, and Mass Production).
Serve as the primary point of contact for external clients or internal product business units regarding program status, risk mitigation, and technical trade-offs.
Technical Acumen: Ability to interpret engineering drawings
BOM structures
DFM/DFA feedback
and manufacturing line balancing reports.
Software Proficiency: Advanced mastery of MS Project / Primavera
Jira
ERP platforms (SAP
Oracle)
and PLM systems (Agile
Windchill).
Cross-Functional Influence: Strong leadership presence capable of driving alignment across Engineering
Operations
Supply Chain
and Commercial teams without direct reporting authority.
Risk Management: Skilled in quantitative risk analysis
root-cause problem solving (8D
5-Why)
and contingency planning.
Strong mechanical and electrical troubleshooting skills.
Knowledge of semiconductor test equipment
handlers
and manufacturing systems.
Ability to read technical drawings
manuals
and schematics.
Familiarity with preventive maintenance and equipment reliability practices.
Good problem-solving and teamwork skills.
+7
Be an early applicant!
Posted
a month ago
High Opportunity
Chat Available
You can chat with the employer only after applying for this job.
Strong mechanical and electrical troubleshooting skills.
Knowledge of semiconductor test equipment
handlers
and manufacturing systems.
Ability to read technical drawings
manuals
and schematics.
Familiarity with preventive maintenance and equipment reliability practices.
Good problem-solving and teamwork skills.
End-to-End Execution: Plan, execute, and monitor the overall program lifecycle. Drive the creation, review, approval, and maintenance of the Program Plan and Work Breakdown Structure (WBS), including resource allocation.
Lifecycle Management: Implement changes as dictated by the product lifecycle process and proactively recommend process improvements.
Interdependency Management: Coordinate multiple projects, manage their interdependencies, and optimize resource utilization across the entire program.
...