Perform welding works and structural fittings in accordance to requirements specified in the manufacturing drawings and welding standards in the MHE Quality Management System. This includes ensuring that all welding work processes and activities done by sub-contractors meet in-house quality standards and targeted scheduled dates.
Perform all assigned welding activities for steel structures in accordance to design requirements, welding procedures and sequence as specified in manufacturing drawings so as to ensure that work done meets in-house welding standards as per QMS. This includes selecting the most appropriate welding methodology on the steel structures.
Ensure that the selection and usage of welding consumables are based on specified welding procedures and that the quality of welding works carried out by in-house sub-contractors complies with the non destructive test (NDT) and/or MHE QC requirements.
...
Kerja-kerja utama dalam proses kimpalan termasuk barangan besi dan ‘stainless steel’. / Primary work on welding process which included iron and stainless steel.
Menyediakan dan mengedalikan mesin kimpalan. / Set up and operate welding machine.
Periksa kimpalan untuk memastikan hasil berkualiti. / Inspect welds for quality and strength.
...
Precision Welding: Execute high-quality welds using processes such as SMAW, GMAW, FCAW, and GTAW, strictly adhering to established Welding Procedure Specifications (WPS).
Fabrication & Assembly: Read and interpret complex technical blueprints, work orders, and welding symbols to accurately fabricate metal parts.
Material Preparation: Perform pre-welding tasks including measuring, cutting, grinding, and fitting components to exact tolerances.
...