- Pasir Gudang Johor Malaysia
Lokasi Kerja
Penerangan Kerja
Tanggungjawab
Job Description: MEP Engineer
Position Purpose
The MEP Engineer coordinates the installation, testing, and balancing of all Mechanical, Electrical, and Plumbing systems. This role bridges the gap between different engineering disciplines, ensuring that power, cooling, and water infrastructure integrate perfectly into the building design.
Key Responsibilities
· Site Coordination: Oversee and coordinate day-to-day installation activities for all MEP trades on the construction floor.
· Progress Tracking: Monitor subcontractor performance against the master construction schedule to prevent delays.
· Design Review: Cross-check structural, architectural, and MEP drawings to identify and resolve spatial clashes before installation using digital models.
· Testing & Commissioning (T&C): Assist the commissioning agent during the critical Level 1 to Level 5 data centre commissioning phases.
· Problem Solving: Resolve technical engineering issues and coordinate requests for information (RFIs) between site teams, clients, and consultants.
Job Types: Full-time, Contract
Pay: RM6,000.00 - RM12,000.00 per month
Work Location: In person
Peringatan Penting
Jangan pernah kongsikan maklumat bank atau kad kredit anda semasa memohon pekerjaan. Elakkan membuat sebarang pembayaran atau mengisi survey yang tidak berkaitan. Jika ada yang mencurigakan, sila laporkan iklan pekerjaan ini segera.