jobs in AG STAFFING

Kerja Sepenuh Masa Electrical Project Managers - Data Centre Construction - JB-KL, Gaji tinggi MYR 20,000 di AG STAFFING Federal Territory - Maukerja

Electrical Project Managers - Data Centre Construction - JB-KL

KL City, Federal Territory

Kongsi
Simpan

Lokasi Kerja

  • Kuala Lumpur Federal Territory Malaysia

Penerangan Kerja

Tanggungjawab

Client is an international PMC hiring for multiple vacancies for their data centre contruction projects in JB, Nusajaya, KL and Cyberjaya.

Electrical Project Managers - Data Centre Construction - JB/KL

Key Responsibilities

1. Technical Execution & Engineering Oversight

  • System Delivery: Oversee the installation of 132kV/33kV sub-stations, MV/LV switchgear, step-down transformers, UPS systems (2N/N+1), backup diesel generators, busduct tracks, and specialized clean earthing systems.
  • Design Review: Evaluate Single-Line Diagrams (SLDs), shop drawings, containment layouts, and engineering calculations to resolve technical clashes before construction begins.
  • Cooling Integration: Coordinate power distribution modifications required for high-density IT racks, including transition paths from traditional air cooling to liquid/direct-to-chip cooling architectures.

2. Project Planning & Procurement

  • Schedule Management: Develop and manage detailed electrical work packages, tracking milestones via MS Project or Primavera P6 to hit strict Ready-for-Service (RFS) deadlines.
  • Long-Lead Tracking: Monitor the manufacturing and delivery of long-lead equipment (e.g., UPS, generators, transformers) to prevent critical path site delays.
  • Subcontractor Management: Supervise electrical subcontractors, evaluate progress claims, and manage variation orders (VOs) alongside the commercial team.

3. Regulatory Compliance, Quality & Safety

  • Utility Coordination: Liaise with Tenaga Nasional Berhad (TNB) and Suruhanjaya Tenaga (ST) for grid interconnection, testing approvals, and energization clearance.
  • Statutory Submissions: Work closely with the appointed ST-certified Competent Electrical Engineer to secure legal sign-offs, including Form G and Form H approvals.
  • Site Safety: Enforce strict Lock-Out, Tag-Out (LOTO) systems, High Voltage testing permits, and risk assessment strategies (RAMS) in compliance with CIDB and DOSH guidelines.

Job Types: Full-time, Contract

Pay: RM12,000.00 - RM20,000.00 per month

Work Location: In person

Peringatan Penting

Jangan pernah kongsikan maklumat bank atau kad kredit anda semasa memohon pekerjaan. Elakkan membuat sebarang pembayaran atau mengisi survey yang tidak berkaitan. Jika ada yang mencurigakan, sila laporkan iklan pekerjaan ini segera.

Lebih Lanjut