jobs in AG STAFFING

Kerja Sepenuh Masa Senior Project Delivery Lead - Data Centre Construction - JB-KL, Gaji tinggi MYR 28,000 di AG STAFFING Johor - Maukerja

Senior Project Delivery Lead - Data Centre Construction - JB-KL

Kongsi
Simpan

Lokasi Kerja

  • Johor Bahru Johor Malaysia

Penerangan Kerja

Tanggungjawab

Client is an international PMC hiring for multiple vacancies for their data centre contruction projects in JB, Nusajaya, KL and Cyberjaya.

Senior Project Delivery Lead - Data Centre Construction - JB/KL

Role Summary

To oversee the end-to-end execution of hyperscale and enterprise data centre construction projects. You will lead multi-disciplinary project teams, general contractors, and consultants from pre-construction and permitting through to Integrated Systems Testing (IST) and operational handover. The ideal candidate brings deep technical fluency in mission-critical Civil, Structural, Architectural (CSA) and Mechanical, Electrical, and Plumbing (MEP) systems, alongside a proven track record of delivering complex builds safely, on schedule, and within CAPEX targets.

Key Responsibilities

  • End-to-End Project Execution: Lead all phases of data centre delivery—including site readiness, design review, procurement, construction, commissioning (Cx), and handover to Operations.
  • Budget, Schedule & Risk Management: Own the master project schedule and CAPEX budget. Monitor cash flow, approve variations, mitigate critical-path delays, and deliver executive-level progress reports.
  • CSA & MEP Coordination: Drive seamless integration between CSA works and mission-critical MEP infrastructure (HV/MV substations, backup generators, UPS systems, chillers, and liquid/air cooling loops).
  • Stakeholder & Vendor Governance: Manage general contractors, design consultants, cost managers (QS), and utility providers (e.g., TNB, water authorities) to enforce contractual SLAs and milestones.
  • EHS & Quality Assurance: Champion a zero-harm safety culture on site, ensuring strict compliance with Malaysian DOSH/OSHA regulations, local municipal codes (BOMBA, CIDB), and Tier III/IV quality standards.
  • Commissioning & Handover: Oversee Level 1–5 commissioning processes and Integrated Systems Testing (IST), ensuring complete as-built documentation and smooth transition to Facility Operations.

Job Types: Full-time, Contract

Pay: RM20,000.00 - RM28,000.00 per month

Work Location: In person

Peringatan Penting

Jangan pernah kongsikan maklumat bank atau kad kredit anda semasa memohon pekerjaan. Elakkan membuat sebarang pembayaran atau mengisi survey yang tidak berkaitan. Jika ada yang mencurigakan, sila laporkan iklan pekerjaan ini segera.

Lebih Lanjut