jobs in AG STAFFING

Kerja Sepenuh Masa Fire Protection Engineers (Data Centre Construction) JB, Gaji tinggi MYR 12,000 di AG STAFFING Johor - Maukerja

Fire Protection Engineers (Data Centre Construction) JB

Gerbang Nusajaya, Johor

Kongsi
Simpan

Lokasi Kerja

  • Gerbang Nusajaya Johor Malaysia

Penerangan Kerja

Tanggungjawab

Job Description: Fire Protection Engineer

Position Purpose

The Fire Protection Engineer designs and supervises systems that detect and put out fires without destroying sensitive electronic hardware. They ensure the building complies with strict life-safety laws.

Key Responsibilities

· Specialized Suppression: Oversee the installation of data centre-specific fire systems, including Pre-Action sprinklers and Gas Suppression Systems (e.g., FM-200, Novec 1230, or Inert gas).

· Early Detection: Supervise the deployment of VESDA (Very Early Smoke Detection Apparatus) and regular smoke detector networks.

· Bomba Clearance: Manage room integrity testing (door fan tests) for gas rooms and lead inspections to secure the Certificate of Completion and Compliance (CCC) from Jabatan Bomba dan Penyelamat.

· Life Safety Integration: Ensure fire alarm systems smoothly trigger fire doors, access control overrides, and HVAC shutdowns during emergencies.

Job Types: Full-time, Contract

Pay: RM6,000.00 - RM12,000.00 per month

Work Location: In person

Peringatan Penting

Jangan pernah kongsikan maklumat bank atau kad kredit anda semasa memohon pekerjaan. Elakkan membuat sebarang pembayaran atau mengisi survey yang tidak berkaitan. Jika ada yang mencurigakan, sila laporkan iklan pekerjaan ini segera.

Lebih Lanjut